GTLTelecoms
← All Projects/Corporate Connectivity

Corporate Fibre Network

Sandton Business Park · 10 Gbps Backbone · 320 Endpoints

Corporate Fibre Network
01

The Challenge

A growing corporate office with an unreliable shared internet line, slow internal file transfers and no structured cabling standard across three floors.

02

The Environment

Three floors of open-plan offices in a Sandton business park, roughly 320 networked endpoints. Peak load came from large file transfers and video meetings on a single shared internet line.

03

The Design

GTL designed and installed a 10G backbone with structured Cat6a cabling, managed switching, enterprise firewall and redundant dual-wan fibre links.

04

The Deployment

Works happened floor by floor after hours to avoid disruption: structured Cat6a cabling, 10G core switches, the enterprise firewall and dual WAN links — followed by a failover test with the IT team watching, and full Wi-Fi 6 coverage verified at every desk.

Equipment Deployed

  • 10G core switches
  • Cat6a structured cabling
  • Enterprise firewall
  • Dual WAN failover
  • Managed Wi-Fi 6 APs
05

The Outcome

Full 10G internal backbone

Failover tested with no interruption to the business

320 endpoints on structured cabling

Wi-Fi coverage at every desk

The Method

Every project runs through the same discipline: Understand → Design → Deploy → Support. This is how GTL works on every site.

How GTL Engineers

Get Started

Ready to get started?

Tell us what you need and get a solution design tailored to your needs within 2 hours.